One more summer the Department of Education has made a series of investments in improvement and conditioning in the public schools of the municipality, meeting the main needs of each center and in coordination with their addresses:
CAI Los Cerezos
· A railing has been installed on the access porch to protect the children's exit from road traffic.
· The panels of the façade and the vestibule will be screwed soon to ensure their fixation.
CEIP Our Lady of the Rosary
· Four classrooms have been painted in pavilion C and two in pavilion B, as well as other rooms.
· Electrical installations, air conditioning, public address system, computer and others.
CEIP Ricardo Codorníu
· A mobile awning has been installed in the playground.
· Four classrooms, offices and hallway have been painted.
CEIP Prince of Spain
· Railings, bars and metal doors, walls of the patio and the deck have been painted.
· Two doors have been installed on the emergency staircase and the pavilion door has been modified with stainless steel to prevent corrosion.
CEIP Sierra Espuña
· Part of the patio has been paved with concrete slab.
The total amount of all these works amounts to 38.0149 euros VAT included.
In addition, by the end of the year a reform will be carried out to expand the computer classroom of the CEIP Ginés Díaz - San Cristóbal, whose amount will be added to the amount indicated.
Source: Ayuntamiento de Alhama de Murcia