The municipal department of Infrastructures and Public Services is carrying out patching on the Pola road.The works consist of covering the bumps in the vial with an asphalt emulsion and gravel of different granulometry: (12-20, 6-12 and porphyry 3-6 mm).For this, a truck with gravel paver, a tank for irrigation of the emulsion and a 5.5 ton compactor are being used.The works began on Monday the 22nd and are scheduled to finish this Thursday, June 25.
Source: Ayuntamiento de Alhama de Murcia